Steel Products for Landscape and Civil Projects
A landscape or civil order can include stone baskets, fence panels and steel grating with different design inputs. Keep each group tied to its own drawing and measurements. Relia can compare available candidates once the visible stone face, boundary details and any retained drain seats are recorded separately.
- Defined scopes
- Basket face, fence line and drainage selection on separate quantities
- Pre-order evidence
- Sample face or connection detail and approved grating seat information by item

The basket drawing separates wire and outer size
The welded example lists a 50 × 50 mm option and box sizes such as 1 × 0.5 × 1 m. The woven entry lists 1 × 1 × 1 m to 3 × 1 × 1 m nominal formats. Select mesh construction and joining parts against the approved project detail. Relia can compare basket combinations once the wire, opening and outer dimensions appear in separate fields.

- Landscape basket
- Send the stone range, visible wall face and selected mesh orientation.
- Riverbank work
- Use the engineer's basket schedule and the exact joining method.
- Walkway or drainage grating
- Send the approved loading and support detail for that area independently.
Three material schedules inside one project
Give each purchase a short schedule with the drawing and acceptance detail it actually needs. The schedules can share a delivery plan while keeping the important measurements visible.
Review the separate scope lines- Gabion face and bodySet the stone sample, visible mesh orientation, outer box size and joining components.
- Fence and retained connectionsMark fence run, opening and base conditions, plus the fittings that need to mate on site.
- Drain and gratingUse the approved seat, area of use, span and selected profile for each piece in the schedule.
- Shared receiving planCombine dispatch timing and destinations with individual scope marks on each pack.
Distinct scopes in one project package
Keep different uses in separate schedules so a landscape finish requirement, riverbank approval or vehicle load reaches the right part of the offer. Put an identified drawing and quantity on each scope before comparing project offers.
| Scope | Relevant catalogue reference | Confirm in the project |
|---|---|---|
| Visible landscape face | Fill grading, grid direction, finished basket and joins | |
| Riverbank design | Approved mesh construction, wire and coating, fastening method and applicable proof | |
| Walkway grating | Industrial bar grating lists 30/40/60/100 mm bearing pitch options | Approved load case, bearing direction, clear span and seats |
| Retained drain frame | Frame section, recess, access and actual traffic/load conditions |
A sample is useful for the visible stone face
Use a representative grading sample and compare it in the two specified mesh openings. Mark the visible face and the long aperture axis on the drawing so the sample and production basket match. Use a representative stone lot for the first face and capture the edge and joining parts too.

Conditions that change the order
Small site details can move a part from one ordering group to another. Tell us when the project retains a frame or requires approved evidence for a particular zone. Mark the location and the site condition that change the selected product or support detail.
Identify the acceptance input for each material schedule. The gabion face comparison uses the proposed stone and grid orientation, while the vehicle trench guide uses the approved seat, span and loading detail. Give each the drawing revision it needs and retain their separate evidence even when both ship together.
- Structural basketGive the drawing for geometry, wire construction and all joining parts.
- Walkway or vehicle crossingGive the approved load and support conditions for the exact grate.
- Landscape edgingIdentify appearance, wire finish and approved fill grading.
Existing seats control a drain replacement
Use the same measuring datum at the first, middle and last cover. Give the clear opening, support width and recess depth. A trial cover can show which bays need their own cut dimensions before an order. Measure existing seats using a common datum along the trench before requesting a replacement piece.

Specialist guides and technical references
Choose the guide that matches the drawing or intended use. Use applicable project requirements for each scope. Use the specialist guide that matches each purchase and identify the record still needed for that scope.
- If the design specifies a riverbank basketWelded and Woven Gabion Baskets for Riverbank ProjectsCheck weave, dividers and joining parts by type.
- If the works include a steel platformGalvanized Steel Grating for Walkways and Custom PlatformsIdentify bearing direction and supports before selecting pitch.
Release each materials list separately
One site can use several acceptance documents. Keep the quote lines and approved drawing revisions linked. Keep the approved basket, boundary and grating schedules individually traceable through delivery.
- Start with these inputsSeparate basket, walkway and drainage lines
Use the approved stone and basket geometry for gabions. Identify spans and supporting seats independently for grating.
- Specify the orderCheck one sample by the detail that controls use
Compare the visible face and joiners for a basket. For a drain retrofit, compare the finished piece with the retained seat.
- Verify before releaseRelease each group against its own evidence
Keep the accepted drawing, quantities and packing labels with that material. Use the specified load conditions for steel grating at each location.
Detailed checks for this order
- DefineMark the location and intended use.
- VerifyConnect the measured seats or basket design to the selected assembly.
- ReleaseLabel parts and packs with the matching reference.
Send the separate civil and landscape drawings
Send one project cover sheet with separate basket, fencing and drainage schedules. Include the installation or receiving order and any conditions that change the identified parts.
- Basket
- Dimensions, grid, stone and coating
- Grating
- Seat, bearing direction and approved loading
- Order
- Quantities, dates and document requirements
